8 1 2015 BRG PREMANT district heating pipe PRE Subject to technical changes 6 400 Transport and storage Transport Pipes preformed parts and accessories are usually delivered by truck free site as per our valid Conditions of Sale or Delivery Due to the transfer of risk on delivery it is advisable for the client to nominate and provide a person responsible for receiving the goods To avoid costly waiting times the unloading locations should be suitably prepared Unloading handling Unloading is the responsibility of the client recipient Except for pipes up to about DN 80 which can be unloaded manually lifting gear must be used for unloading To prevent damage especially to the thermal insulation the preformed parts and pipes must not be thrown or rolled Figure 1 Suspension gear for accident proof protective handling Traverse with textile belts min 100 mm wide Stay cables at adequate distance from casing pipe Only attach hooks to the steel pipe Figure 3 Temporary storage on wooden planks Figure 2 Temporary storage on a levelled sand bed The pipes and preformed parts have been treated to protect them against moisture in the factory and where possible they must be stored in a dry covered location on planks or wooden pallets in order to protect them Levelled sand bed Level surface m ax 2 0 m m in 0 0 6 m ap pr ox 0 1 5 m m ax 2 0 m Up to DN 150 min 0 20 m DN 150 min 0 25 m max 1 90 m 0 4 m

Vorschau Katalog_e_12.8. Seite 251
Hinweis: Dies ist eine maschinenlesbare No-Flash Ansicht.
Klicken Sie hier um zur Online-Version zu gelangen.